You do not need a technical background to automate fund reporting. The decisions that determine success are business decisions: which output is automated first, which rules are binding, when a result counts as correct, and who is responsible for the pipeline afterwards. Data connections, the choice of tools, the build and its operation in your environment sit with the technical partner. That holds for investment foundations and pension funds as much as for fund management companies and asset managers, FINMA-regulated or not.
The first decision is scope. Which factsheet, which investment groups or funds, which language come first? Only someone who knows where the monthly effort actually arises, and which publication date creates the most pressure, can answer that. A narrow first slice, such as one factsheet type in one language, is not a limitation but the basis for making the benefit visible and measurable quickly. The technology follows this priority, not the other way round.
The second decision concerns the business rules. How is rounding done, which benchmark applies to which product, how are special cases handled, which key figure appears from when? Today these rules often exist only in spreadsheets and in the knowledge of individual people. The partner makes them visible and implements them, but the business side has to set them. A pipeline can only be as right as the rules it is given, and this is exactly where your expertise cannot be replaced.
The third decision is what counts as correct and who signs off. Before the build, define how you recognise a correct factsheet: the same figures as in the existing process, the same presentation, differences that can be traced. It should be equally clear that the professional sign-off before publication stays with you. Automation replaces the production of the report, not the responsibility for what is published.
The fourth decision concerns the time after the build. Who owns the pipeline, templates and logic, and who keeps them current when a share class is added or a rule changes: your team, the partner, or both? This question belongs at the start, not at the end. At Amula the answer is settled: you own the pipeline, templates and logic; it runs in your own environment, on the systems you already use.
What you do not have to decide is how the data is connected, which tool within your stack takes on which task, or how the pipeline is tested technically. Knowledge of Microsoft or Power BI is not a precondition, and neither are the systems themselves: the build uses the stack you already run. You can still check the technical work, with business questions: where does this figure come from? What happens if a data delivery arrives late? Can my team read the rules without knowing the code?
What the result looks like in operation can be seen at IST Investmentstiftung: Amula's reporting pipeline has been live there since October 2025, with 39 investment groups in scope and being rolled out group by group, rollout ongoing. The first production pipeline was live about two months after the strategy phase began. The factsheets are produced in German and French in IST's own design, and monthly effort is down from 20+ to 3–4 hours (an internal estimate based on first measurements).
Once you have taken these four decisions, the larger part of steering the project is done. That is where Amula's reporting automation starts: you bring scope, business rules, sign-off and responsibility; Amula takes on the technical build. If you want to judge the output first, you can start with a proof of concept: up to 10 key pages of your report rebuilt in your design with dummy data, before committing to a full build. Know your bottleneck? Start with reporting. Not sure where to start? Start with the AI Assessment.